3S Bridge can also provide a complete package for the design and supply of steel girder bridges, either for replacement or new construction. Steel girders can be installed quickly by a launch method without the need for heavy cranes or often difficult to install and expensive temporary supports.

Locally supplied concrete is used to complete the composite structure. Here again, 3S Bridge includes the permanent formwork, all the bolts, bearings and parapet railing. 3S can also supply the street lighting and expansion joints. All the girder bridges are designed to international codes and fabricated from high strength steel.

The three-span bridge shown below was built in 12 months, including all foundations and substructure.

Girder Bridges

We can provide and interconnect any of the following bolt-on services to our bridge build service to ensure a successful, high quality completion:

Define the requirement

  • Traffic studies

  • River Hydraulics

  • Topographical survey

  • Geotechnical Survey

  • Site access​

Design

  • Superstructure

  • Substructure

  • Profile and geometry

  • Compliant with leading codes

  • Constructability

Logistics

  • Delivery coordination

  • Packing 

  • Ocean freight

  • Over land Transportation

  • Handling  

Site Supervision

  • Resource Planning

  • Sequencing 

  • Methodology

  • Quality Control   

Building bridges is at the core of all our projects. To complete projects with you faster and more easily, we offer both project management and bolt-on expert services.

In addition to bridge design and manufacture, we can supply or source all services connected with installation to ensure the success of your bridge project.

Bolt-on Services

“We would fully recommend 3S Bridge, LLC to any potential client and have no hesitation in working with them in the future.”
“We are pleased to confirm that in all areas above 3S Bridge met or exceeded the specifications and work order” 

Simon Daniel  

Deputy Permanent Secretary – St. Lucia 

“3S Bridge, LLC of the United States supplied the steel structure, and we can confirm that they supplied the bridge in Full compliance” 
“The complexity of the superstructure would also prove to be particularly challenging to assemble and install. 3S Bridge’s site support during the preassembly phase was valuable to ensure the correct profile was achieved”

Luis Campana

President, Grupo Cotrans – Panama   

BRIDGES OF PEACE PROGRAMME

"The bridges have positively impacted on the quality of life and economic revival of our remote communities."

Dr Omar Rangel

Development - Bolivar State, Colombia

“For the community the bridges are also synonymous with safety. The poor condition of the roads and previous inadequate structures forced them to take unsafe alternative routes. Now they can travel in safety and over shorter distances.” 

Diana Manrique

Secretary of Infrastructure, Bolivar State, Colombia

Client feedback

bottom of page